Commercial Projects (value)
Pre-Bid Phase:$6,140,775,143
Bid Phase:$164,149,000
Post-Bid:$9,544,784,497
Civil Projects (value)
Pre-Bid Phase:$879,681,115
Bid Phase:$53,509,634
Post-Bid:$4,779,174,505



Airport Runway Project Case Study in Hawaii

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Hawaii are also available.

Project Overview

Project Title:HICKAM AIR FORCE BASE HOT CARGO PADS
Estimated Value:$10,000,000
The cost to build airport runways in Hawaii depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Hawaii
County:Honolulu
City:Hickam AFB
Address:Hickam Air Force Base

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction FY05 MCA PN 57423 Hot Cargo Pads, Hickam Air Force Base, Oahu, HI, Provides Two (2) New Asphalt Concrete Hot Cargo Pads (HCP), Each HCP Consists Of A 75-Foot Wide Asphalt Concrete Taxiway With 50-Foot Shoulders And 75-Foot Wide Concrete Apron, The Two New Pads Will Be Constructed On Each Side Of The Existing HCP, A 22-Foot Wide Asphalt Concrete Access Road Will Connect The HCP To The New Staging Area, The Staging Area Will Be Used To Stage Stryker Combat Vehicles Prior To Loading Onto Aircraft, Other Appurtenances Include An Inspector's Building, Lighting, Fencing, Grading, Drainage, Utilities, Telecommunication, And Fire Protection