Airport Runway Project Case Study in Colorado

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in Colorado are also available.

Project Overview

Project Title:COLO SPRINGS AIRPORT TAXIWAY H
Estimated Value:$2,460,200
The cost to build airport runways in Colorado depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Colorado
County:El Paso
City:Colorado Springs
Address:Colorado Springs Airport

Project Type

Building Category:Airport Runways
Work Type:New

Project Description:

Airport Construction, Road[s], Electrical Work, Excavating & Grading, Fencing, Pavement Markers, Miscellaneous Civil, Flood Control, Sitework Project Is To Construct New Taxiway (Extension) "H" at the Colorado Springs Airport, Past The East Edge Of Taxiway "P" And The West Edge Of Taxiway "M." Must Be Constructed To Design Group IV Standards. Taxiway Is 75 Feet Wide, Has 15-inch Portland Cement Concrete (PCC) Pavement Section Placed On A Six-inch Cement Treated Sand Base With 24-inches Of Re-compacted Subgrade. Project Includes Installation Of New Edge Light Fixtures Including New Base Cans And Transformers. All Cable Runs Will Be Placed In Duct With Appropriate Drainage And Counterpoise Protection. Signage Will Be Installed According To Latest FAA requirements. New Drainage Systems Will Be Installed For Flood Protection, And New Taxiway Markings Will Be Painted After The Pavement Has Been Completed.