Airport Runway Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in California are also available.

Project Overview

Project Title:GILLESPIE FIELD WEST TRANSIENT APRON
Estimated Value:$2,029,420
The cost to build electrical work in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:San Diego
City:El Cajon
Address:1980 Joe Crosson Dr

Project Type

Building Category:Electrical Work, Airport Runways, Fencing
Work Type:New

Project Description:

Airport Construction, Sidewalk[s], Curb[s], Gutter[s], Electrical Work, Excavating & Grading, Fencing, Pavement Markers Constructing A Transient Apron: Earthwork; Placing Cement Treated Subgrade; Aggregate Base & Asphalt Concrete; Placing Concrete Encased Slotted Drain Pipe; Constructing Concrete Cleanouts; Outlet Structure Driveway & Swale; Installing Electrical Duct & Cable; Intercepting Taxiway Lights; Installing Chain Link Fencing; Installing Guidance Signs; Pavement Markings; & Implementing Water Pollution Control Measures