Airport Runway Project Case Study in California

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of airport runway projects in California are also available.

Project Overview

Project Title:NAVAL ATC TOWER & TAXIWAY
Start Date:2004-09-01
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build air traffic control towers in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:San Diego
City:Coronado
Address:Naval Air Station North Island

Project Type

Building Category:Air Traffic Control Towers, Aircraft Hangars, Airport Runways
Work Type:New

Project Description:

Air Traffic Control Tower, Military - Miscellaneous, Airport Construction, Sitework Air Traffic Control Tower Structural Steel Frame, Other Exterior Wall, Other Roof Structure, Modified Bitumen Roof, Membrane Roofing, Other Mechanical System Overhead Doors, Hanger Doors, Aluminum Windows, Ceramic Quarry Tile, Fire Sprinklers, Hydraulic Elevators, Fire Alarms, Cast Stone Exterior