CMD Group is a ConstructConnect® company. Learn more

Resource Center

Building Types


Fill out the form to get a demo of our project database

Total value of Wisconsin construction projects currently in our database:

Commercial Projects (value)
Pre-Bid Phase:$10,097,853,409
Bid Phase:$176,466,500
Post-Bid:$26,777,423,454
Civil Projects (value)
Pre-Bid Phase:$1,649,392,840
Bid Phase:$160,075,798
Post-Bid:$14,615,187,690



Air Traffic Control Tower Project Case Study in Wisconsin

This project information is pulled from our archive of hundreds of thousands of construction projects. Use it to research ideas and potential partners for your own project. Additional examples of air traffic control tower projects in Wisconsin are also available.

Project Overview

Project Title:WITTMAN AIRPORT AIR TRAFFIC CTRL TOWER
Estimated Value:$3,675,480
The cost to build transportation terminals in Wisconsin depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:Wisconsin
County:Winnebago
City:Oshkosh
Address:525 W 20th Ave

Project Type

Building Category:Transportation Terminals, Air Traffic Control Towers
Work Type:New

Project Description:

Air Traffic Control Tower Construction Of A New Air Traffic Control Tower, Including Concrete Foundation, Structural Steel Frame, Brick Veneer Exterior, Masonry Exterior, Membrane Roofing & Pre-Cast Structural Frame; Utilities, Roadways, Parking Lots, Site Work & Demolition/Restoration Of The Existing Tower & Associated Grounds & The Extension Of The Existing Cables From The Air Field To The New ATCT