Building Program for Green Design

02/23/2011 by Andy Walker, PhD, PE.

Share

The building program is a document conveying the conditions and requirements of a project. Along with specifying the number of square feet of different types of space (office, assembly, laboratory, etc.) and the need to meet code requirements, the program should state clear and quantitative sustainability performance goals. For example, the building program may specify a desired LEED level (Silver, Gold, Platinum), or it may specify a maximum dollar amount per square foot per year operating cost. Other goals frequently described in the program relate to achievement of a project that is beautiful, safe, reliable, or comfortable, or that provides superior air and light quality.


Some organizations, such as federal agencies, have developed their own architectural guidelines regarding sustainability that would be referred to in the building program. The building program would also document the energy-related needs of users—a critical first step in designing systems to meet those needs efficiently, and an indicator of the suitability of various renewable energy sources.


Goal-setting should be considered a team activity. Team members must proceed with a keen awareness of, and commitment to, project goals. This is much more likely to happen if they have a sense of control by sharing in setting goals and also in determining how success will be measured. If a goal is stated very generally, as “to minimize life cycle cost through sustainable design principles,” it would be difficult to judge whether it was met in the end. This is why a more quantitative goal could be more useful.


Energy performance goals can be set with different objectives. Annual energy use per gross square foot (BTU/SF/year) is a common metric among federal projects because that is the way progress toward statutory goals is tracked. Shortcomings of BTU/SF/year as a measurement standard are that BTUs supplied by different fuels have different costs, and there is no differentiation between time-of-use or demand rates.


Another option is to specify an energy use goal as a certain percentage less than that required by code. For example, a goal might be to use 25% less energy than allowed by 10CFR434/435 for federal projects, ASHRAE 90.1 for commercial buildings, or the California Title 24 energy efficiency standards. A useful metric is annual operating costs ($/year), which accounts for costs of different fuels and time-of-use and demand savings, and integrates well as a figure of merit with all other annual costs, such as operation, maintenance, water, and disposal.


It is important to use the same yardstick to measure performance as was used to set the goal in the first place. Disputes often arise when goals set using a computer model are compared to actual utility bills. There are many variables, including schedules, occupancy, and plug loads, that affect energy use after a building is occupied. These are outside of the designer’s control. Although the performance of the building will ultimately be evaluated by measuring the actual resource use (such as utility bills) of the completed building, the performance of the design team should be evaluated by simulating the final design with the same computer program and uncontrolled parameters (weather file, utility rates, occupancy, schedules, plug loads) that were used to set the goal.


How are the energy goals set before anyone knows what the building looks like? One approach is to model a default building in the shape of a shoebox with the same floor area and number of floors, the same occupancy schedules, and the same kinds of space (office, circulation, kitchen, meeting rooms, storage, etc.) as called for in the building program. First, a reference case is defined to serve as a benchmark with which the performance of the evolving design will be compared. For the reference case shoebox model, the properties of walls, roofs, windows, and mechanical systems are the minimum required by applicable codes. The annual energy performance of the reference case shoebox model is evaluated using climate data and utility rates for the site. Then a suite of energy-efficiency measures is modeled using the shoebox to determine which strategies are most effective. For example, if evaporative cooling is effective on the shoebox model, it is likely to be effective for the actual design. Measures are evaluated in combination with each other to account for interactions.


The shoebox model with the most cost-effective package of measures implemented provides an estimate of what should be achievable in the design, but the goal is usually set above this level. For example, a reference case might be 100 KBTU/SF/year, the shoebox with all ideal cost-effective measures implemented might be 30 KBTU/SF/year, and the actual goal for the project might be set at 40 KBTU/SF/year, a reasonable goal for the design team. The Energy-10 computer program has been developed especially to implement this pre-design analysis and to aid in setting energy-use goals.


Andy Walker, PhD, PE, the author of this article, is senior engineer at the National Renewable Energy Laboratory.This article was adapted from Green Building: Project Planning & Cost Estimating, 3rd Edition, available through RSMeans.

Recent Comments




Article Archive

Date Article
11/17/14 Top 10 largest construction project starts in the U.S. - October 2014
11/14/14 Non-residential Construction Starts Rose Gently in October
07/10/14 The Importance of Matching Volume to Contractor Capacity in JOC Procurement Strategy
07/10/14 Consider a Seed Project as Part of Your JOC Procurement Strategy
07/10/14 The Best Unit Price Book for Your Job Order Contract
07/02/14 ECONOMIC NUGGETS – July 1, 2014
10/23/14 Twenty major upcoming Water Treatment Plants and Manufacturing & Warehousing construction projects - U.S. - October 2014
10/23/14 Twenty major upcoming Alberta and British Columbia construction projects - Canada - October 2014
10/15/14 Trend lines of construction starts in Canada - September 2014
10/15/14 Top 10 largest construction project starts in Canada - September 2014
09/17/14 Twenty major upcoming midwest and northwest construction projects - U.S. - September 2014
09/17/14 Twenty major upcoming medical and educational construction projects - Canada - September 2014
09/17/14 Trend lines of construction starts in Canada - August 2014
09/17/14 Top 10 largest construction project starts in Canada - August 2014
08/15/14 Twenty major upcoming medical and educational construction projects - U.S. - August 2014
08/15/14 Twenty major upcoming industrial and water treatment construction projects - Canada - July 2014
08/15/14 Trend lines of construction starts in Canada - July 2014
08/15/14 Top 10 largest construction project starts in Canada - July 2014
07/24/14 Twenty major upcoming entertainment facility and stadium/arena construction projects - U.S. - July 2014
07/24/14 Twenty major upcoming Ontario and Quebec construction projects - Canada - July 2014
07/24/14 Trend lines of construction starts in Canada - June 2014
07/24/14 Top 10 largest construction project starts in Canada - June 2014
07/16/14
07/14/14 Top 10 largest construction project starts in the U.S. - June 2014
02/03/14 Infographic: Where Can You Use Project Leads in the Construction Process?
11/19/13 RSMeans White Paper Examines Break-even Point for LED Versus Fluorescent Lighting
11/20/13 RSMeans White Paper Examines Break-even for LED vs. Fluorescent Lighting
07/25/13 The Canadian Economy’s Two Great Blessings
02/15/13 Construction Economic Notes – February, 2013
11/05/12 Recycled-Content Tile
10/05/12 Fiber-Cement Siding
09/18/12 Return on Your Green Home Improvement Investment
08/09/12 Green Building Solutions to Stormwater Runoff
08/07/12 An “Aha” Moment Solves Challenge of Cost Estimating Local Circus Roof
07/19/12 Estimate Types
06/20/12 Ground-Source Heat Pump
05/14/12 Universal Design for Outdoor Living
04/23/12 What Is Universal Design?
04/09/12 Natural Landscaping
03/14/12 Green Material Alternatives for Plumbing Fixtures
03/02/12 Budgeting & Financing Green Construction
02/22/12 Greening Your Firm
02/10/12 Roofing Defects
02/06/12 Roofs: energy efficiency strategies
01/18/12 Commercial Real Estate and Green Construction
12/14/11 Renewable Energy & Distributed Generation Technologies
11/04/11 Tubular Skylights
10/04/11 Are Online Ads An Endangered Species?
09/27/11 Performance Bonds Guarantee Clients Receive Exceptional Service
09/15/11 Deconstruction for Green and Economic Benefit
09/01/11 4 Ways for Businesses to Create a Good First Impression on Twitter
08/11/11 Building Information Modeling (BIM) for Green Building
07/21/11 Green Alternatives for Concrete
07/12/11 Evaluating Products Over Their Life Cycle
06/30/11 Low-Cost Green Strategies
06/28/11 Bricks are from Venus, Clicks are from Mars
06/17/11 Zombie Avoidance Techniques for Building Product Manufacturers
06/08/11 Blogs & Websites: The 5 Signs of Website Wellness
06/06/11 Building Product Manufacturers & Green Products
06/01/11 Is Fear of Sharing Information Costing Your Company Sales?
05/26/11 What Are Green Products?
05/20/11 The Building Envelope
05/16/11 Blogging: Website Heal Thyself
05/03/11 Metals Compared to Wood for Sustainable Construction
04/12/11 Storm Water Collection & Infiltration
03/23/11 Commissioning the Green Building
02/23/11 Building Program for Green Design
01/21/11 Building Deconstruction Process
05/02/11 Why Building Product Manufacturers and Social Media Are a Marriage Made in Heaven
05/06/11 Building Product Manufacturers: How Understanding Architects Can Help Your Business
10/21/09 Distributors & Manufacturer Representatives
07/15/10 Estimating Doors: Tips from the Experts
07/06/10 How to Handle Construction Materials to Prevent Mold
06/21/10 How to Maximize the Benefits of Exterior Security Lighting
06/04/10 SmartBuilding Index
06/01/10 Regional Housing Construction Tracking and Forecast Information
05/28/10 How to Find Regional Construction Tracking and Forecast Information
05/24/10 Building Product Manufacturers
05/18/10 Practicing the Art of Sustainability - Why Atlanta's Current Building Codes Need Updating Now
02/23/10 Learning to use EE
11/10/09 Window & Glazing Estimating Tips from RSMeans
01/11/10 Earn AIA CEU Credit Attending RCD Webcasts
07/17/09 Cost Estimators Winning Work With BIM
07/16/09 Becoming an Invited Bidder - More Tips
07/16/09 Becoming an Invited Bidder - Tips
07/16/09 Becoming an Invited Bidder
07/16/09 SmartBIM Object Modeling Guidelines for Revit
07/15/09 Interference Check and BIM
06/26/09 A Look at Contractor Failure: Part 2
06/19/09 RicciGreene Associates
06/19/09 Doug Thornton AIA, LEED A.P. of AERC, PLLC
06/18/09 A Look at Contractor Failure: Part 1
06/12/09 Owners and SmartBIM Objects – What You Need To Do
06/10/09 Dealing with the IRS
06/05/09 Getting Paid on Construction Contracts
06/02/09 BIM Coordination and Collaboration
05/28/09 Marketing Your Construction Firm on the Cheap
05/20/09 Little Habits with Big Payoffs for Contractors
05/12/09 SmartBIM Spaces
05/07/09 AIA Show Recap as Seen by the SmartBIM Solutions Team
04/27/09 Business Case Study - Survey Of Spending Patterns In Educational Facilities
04/23/09 Taking Advantage of the Recession: Hiring the Right People
04/20/09 Cork as a Green Flooring Option
04/08/09 Owners - It's Time to Substantially Increase Your Architect's and Engineer's Fees
03/05/09 There's a Solution to Performing Time Consuming Quantity Take-Offs
02/20/09 SmartBIM Library is Half-Off for a Limited Time Only
02/09/09 You are Wasting Your Money
01/20/09 Obama: 'Dramatic Action' On Economy Needed
01/14/09 Use of BIM Jumps Dramatically Over Last 12 Months
12/10/08 Minimizing the Size of Family Files (Revit Objects)
11/11/08 Maximize Online Advertising Dollars
11/07/08 Architects and Engineers, WE NEED YOU
10/29/08 Why Do You Need SmartBIM Objects
10/28/08 Why Building Information Modeling?
10/29/08 10 Questions To Ask About BIM Objects
10/08/08 The Object Mess
10/07/08 Implementing BIM to Your Office
10/06/08 Meeting the Needs for Governmental BIM Compliance while Avoiding Current Liability Obstacles
09/15/08 The BIM Transformation is Manageable with the NEW SmartBIM Library v3
09/14/08 KOLBE Windows and Doors vs. Building Information Modeling
09/12/08 The Evolution of Building Information Modeling: BIM 1-2-3
08/11/08 BIM 101 Overview - From Hand Drawings, CAD and now BIM
08/12/08 Draper, Inc. on BIM Object Developments
07/08/08 IFD Library Partners work to establish standards for creators of BIM software
06/23/08 Architectural Education
06/17/08 Parametric Revit Objects – Part I - Fundamentals
06/17/08 Window Glazing Coefficients
06/01/08 Frequently Asked Questions About Building Codes
06/05/08 Calling All Current and Prospective Revit Users - This Blog Is For You
05/06/08 System Requirements for SmartBIM Library
05/06/08 SmartBIM Library 2.0 Release Notes
05/05/08 Building Information Modeling Moves into AEC Mainstream, Adding Value to Project Delivery Process
04/08/08 Flooring: Cost Considerations
02/08/10 General Contractors & Trade Contractors
01/24/08 Building Element Models (BEM)
12/21/07 LEED Certification Primer
12/13/07 Building Integrated Photovoltaics (BIPV)
09/24/07 Mixed-mode Building Design Combines Old and New Ideas
10/15/07 Checklists Identify Potential Envelope Design Improvements
10/24/07 Greenroofs as High Performance Design
10/21/07 What Makes a Building Product Green
10/24/07 Lighting Considerations in Green Building
10/24/07 Water Conservation in Green Buildings
10/24/07 Rainwater Collection Systems
10/24/07 Efficient Cooling Methods for Green Buildings
10/24/07 Controlling Heat Transfer in Green Buildings
10/24/07 Limiting Heat Loss Through Windows
10/23/07 Formaldehyde Use in Building Construction
10/23/07 Using Plants to Improve Indoor Air Quality
11/05/07 Greening Healthcare
10/19/07 Daylighting Controls
10/19/07 Use of Windows, Skylights and Light Pipes in Daylighting
10/19/07 An Overview of Daylighting
10/19/07 An Overview of Solar Ventilation Air Heating
10/19/07 Types of Collectors for Solar Water Heating
10/19/07 An Overview of Solar Water Heating
10/19/07 Cooling Load Advoidance
10/19/07 Components of Passive Solar Heating Designs
10/19/07 An Overview of Passive Solar Heating
10/23/07 Improving Indoor Air Quality
10/19/07 An Overview of The LEED Rating System
10/19/07 Cost Considerations in Building Deconstruction
10/17/07 Building Deconstruction
10/25/07 Roofing Considerations in Green Building
10/19/07 Green Site Selection and Development
10/24/07 Reducing Energy Use in Buildings
10/17/07 Green Demolition
10/18/07 Integrating Solar Power Generation into Buildings using Thin Film PV
09/10/07 Compost Company Promotes Green Environment
03/31/06 Green Roof Sets An Example For Minneapolis Sustainable Design

CMD Group- construction industry news-image” title=