Clinic Project Case Study in California

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of clinic projects in California are also available.

Project Overview

Project Title:VENTURA COUNTY MEDICAL CENTER
Estimated Value:$38,478,500
The cost to build clinics in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one,

Project Location

State:California
County:Ventura
City:Ventura
Address:340 Hillmont Ave

Project Type

Building Category:Clinics, Hospitals
Work Type:Addition

Project Description:

Hospital The Scope Of The VCMC Utility Relocation/Modification (Permitted By OSHPD) Consists Of The Relocation Of The Existing Underground Steam, Condensate & Soft Water Lines Serving The Existing Hospital To Allow For Construction Of The VCMC Replacement Clinic; Additionally, Limited Modifications To The Electrical Distribution System Serving The Hospital Will Be Performed; The Scope Of The VCMC Replacement Clinic (Permitted By The County Of Ventura) Consists Of The Constructionof A Fire Sprinklered 79,614 S.F. Five-Story Type I Fire Resistive Primary Care Clinic; The Structure Is Primarily A "B" Occupancy With An Accessory Of "A3" For An Auditorium Located On The First Floor; The Building Is Equipped With Two, Two-Hour Fire Resistive Exit Enclosures; The Remainder Of Th Existing System Is Via Hallways; The Structural System Is A Moment Resistive Steel Framing Supporting Floors Constructed Of Concrete Filled Metal Deck; The Building Will Be Constructed Upon Improved Soil Consisting Of CDSM (Cement Deep Soil Mixing) Columns & A Concrete Mat Foundation System; Additionally There Are Site Improvements Consisting Of Building Demolition Including Hazardous Materials Remediation, Site Clearing & Parking Lot & Landscape Improvements